Townsend 2A
British Columbia
Location
99 Mmcf/d
Capacity
AltaGas
Operator
Sweet gas
Fuel Type
Located on the existing Townsend site, adjacent to the currently operating Townsend Facility, Townsend 2A is a 99 Mmcf/d shallow-cut natural gas processing facility that was commissioned on October 1, 2017.
Overview
Located on the existing Townsend site, adjacent to the currently operating Townsend Facility, Townsend 2A is a 99 Mmcf/d shallow-cut natural gas processing facility that was commissioned on October 1, 2017.